The length of the elevated section of Route I81 that runs through the middle of Syracuse.
Tags: 2012, Connective Corridor, Construction, I81 Challenge, Neighborhood in Transition, Numbers, Syracuse, Syracuse Demographics, Transportation
This entry was posted on Friday, July 27th, 2012 at 10:41 am and is filed under Business, Politics. You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.